Vermont Yankee Relicensing -- Amended Petition (Docket 7862)
Caption:
Amended Petition of Entergy Nuclear Vermont Yankee, LLC, and Entergy Nuclear Operations, Inc., for amendment of their Certificate of Public Good and other approvals required under 30 V.SA. § 231(a) for authority to continue after March 21, 2012, operation of the Vermont Yankee Nuclear Power Station, including the storage of spent nuclear fuel
Amended Petition
Public Participation/ Public Hearings:
- Public hearings for this proceeding were held on November 7, 2012, in Vernon, Vermont, and on November 19, 2012, using the facilities of Vermont Interactive Technologies.
Schedule for the Proceeding
Remaining Schedule (as of 4/26/13):
- April 29, 2013 --- Other Parties' Prefiled Surrebuttal Testimony Due
- May 9, 2013 --- Discovery on Other Parties' Surrebuttal Testimony Due
- May 22, 2013 --- Discovery Responses from Other Parties Due
- May 23, 2013 --- Notices of Depositions Due
- May 28-June 6 --- Depositions (if needed)
- June 17- June 28 --- Technical Hearings (Rebuttal Case)
- August 6, 2013 --- Proposals for Decision and Briefs Due
- August 26, 2013 --- Reply Briefs Due
Link to Complete Schedule for Proceeding
Parties:
Link to list of parties to proceeding
Board Orders and Memoranda:
- Order re Town of Vernon Intervention, entered April 26, 2013
- Memorandum re Requests of Department and VNRC/CWRC, dated April 26, 2013
- Order re Motions for Judicial Notice and Admission of Depositions, entered March 29, 2013
- Order re Motion to Consolidate Hearings, entered March 22, 2013
- Revised Scheduling Order, entered March 6, 2013
- Protective Order re Amended Protective Agreement, entered March 6, 2013
- Order Re: Admissibility Objections to Prefiled Testimony, entered February 8, 2013
- Memorandum re Certain Pending Motions, dated February 4, 2013
- Ruling on Department's Motions regarding Depositions, entered January 28, 2013
- Order re Oral Argument and Motions to Appear, entered January 23, 2013
- Memorandum re Schedule for Hearings dated January 18, 2013
- Memorandum re Extension Request, dated January 10, 2013
- Procedural Order, entered January 7, 2013
- Order re Motion for Declaratory Ruling Prescribing Scope, entered January 7, 2013
- Order re Motions to Intervene and to Appear Pro Hac Vice, entered October 5, 2012
- Protective Order re Protective Agreement, entered September 27, 2012
- Memorandum re Schedule Modification, dated September 6, 2012
- Order re Reconsideration of Schedule, entered July 13, 2012
- Prehearing Conference Memorandum (includes Schedule), entered May 4, 2012
- Clerk's Memorandum of April 26, 2012, re schedule for docket
Link to Certain Motions and Responses
Technical Hearings
Technical hearings related to the direct testimony of the parties were held on eleven days in February between February 11 and February 26, 2013. Technical hearings related to the rebuttal and surrebuttal testimony are scheduled for two weeks in June, beginning on June 17, 2013.
Transcripts of the February technical hearings were prepared by court reporters and are available for public review at the offices of the Public Service Board in Montpelier.
Prefiled Testimony
Rebuttal Testimony of Entergy filed on March 15, 2013
- V. Louise McCarren
- Michael Perito
- Richard Heaps
-
Jeffrey Tannen
- Exhibit EN-JT-10: Additional Resources Relied Upon
- Exhibit EN-JT-11: ISO-NE Strategic Transmission Analysis: Generation Requirements Study 12/13/12
- Exhibit EN-JT-12: Renewable Generation Capacity Additions v. Required Capacity Additions in ISO-NE
- Exhibit EN-JT-13: ISO-NE White Paper -- Aligning Planning and Markets (2011)
- Exhibit EN-JT-14: ISO-NE Winter Operations -- Summary Memo (2/27/13)
- Exhibit EN-JT-15: Assessment of New England's Natural Gas Pipeline Capacity (6/15/12)
- Exhibit EN-JT-16: "In New England, A Natural Gas Trap" New York Times (2/16/13)
- Exhibit EN-JT-17: The Ant, the Grasshopper and Electricity Prices in New England" New York Times (2/25/13)
- Exhibit EN-JT-18: Performance of New England Power System during August 2003 Blackout (ISO-NE 2004)
- Exhibit EN-JT-19: ISO-NE Disturbance Report for n-2 Event Near VY Station, 8/03/06
- Exhibit EN-JT-20: VY Station Plant Process Computer Information for 8/03/06 N-2 Event
- Exhibit EN-JT-21: Vermont Utilities Exposure to Market-Driven Prices
- Exhibit EN-JT-22: Market Savings for Vermont
- Exhibit EN-JT-23: Cleveland Fed Estimates of Inflation Expectations
- Exhibit EN-JT-24: Cleveland Fed Economic Commentary -- Inflation: Noise, Risk and Expectations
- Exhibit EN-JT-25: Henry Hub Natural Gas Price Forecasts
-
Lawrence W. Barnthouse
- Exhibit EN-LWB-1: Overview of Program to Restore Atlantic Salmon to Connecticut River (2004)
- Exhibit EN-LWB-2: Criteria for Determining Maturity Stage in Female American Shad (2001)
- Exhibit EN-LWB-3: Intraspecific Variation in Batch Fecundity of American Shad (2003)
- Exhibit EN-LWB-4: Early Life History and Recruitment of American Shad in Connecticut River (2004)
- Exhibit EN-LWB-5: Correspondence with Ken Sprankle of USFWS (3/9/12)
- Exhibit EN-LWB-6: Curriculum Vitae of Dr. Douglas Heimbuch
- Exhibit EN-LWB-7: Assessment of Potential Effects of River Temperature and Flow on Shad Passage (2013)
- Exhibit EN-LWB-8: Fishes of the Lower Connecticut River and Effects of the Connecticut Yankee Plant (1976)
- Exhibit EN-LWB-9: Curriculum Vitae of Dr. Lawrence Barnthouse
-
Craig Swanson
- Exhibit EN-CS-1: RPS ASA Response to Review of VY Thermal Discharge Modeling (10/15/12)
- Exhibit EN-CS-2: RPS ASA Response to Review of VY Thermal Discharge Permit Requirements (10/16/12)
- Exhibit EN-CS-3: RPS ASA Mixing Analysis at Station 3 Below the Vernon Dam (3/14/13)
- Exhibit EN-CS-4: Letter to Vermont Department of Fish and Wildlife (3/31/05)
- Exhibit EN-CS-5: ANR's Responsiveness Summary for Draft Amended Discharge Permit No. 3-1199 for VY
- Exhibit EN-CS-6 RPS ASA Boundary-Fitted Hydrodynamic and Pollutant Transport Model Bibliography
- Exhibit EN-CS-7: RPS ASA Modeling the Downstream Thermal Effect in Turner Falls Pool
- Exhibit EN-CS-8: Curriculum Vitae of Dr. Swanson
- Harry L. Dodson
- William Cloutier
-
George Thomas
- Exhibit EN-GT-1: Resume of George Thomas
- Exhibit EN-GT-2: Letter form Vermont Department of Environmental Conservation ("DEC"), dated April 26, 2011
- Exhibit EN-GT-3: Outline of VY's NDPES Monitoring Progam Suggestions (Normandeau Assoc. 7/19/11)
- Exhibit EN-GT-4: Letter to DEC dated 1/7/13
- Exhibit EN-GT-5: Assessment of Thermal Exposure of Adult and Juvenile American Shad (Jan. 2013)
- Exhibit EN-GT-6: Letter from ANR Discharge Permits Section dated 9/21/05
- Exhibit EN-GT-7: Letter from ANR Wastewater Management dated 12/15/05
- Exhibit EN-GT-8: Letter from ANR Discharge Permits Section dated 2/14/06
- Exhibit EN-GT-9: Assessment of Thermal Exposure and Transit Time of Emigrating Atlantic Salmon Smolts
- Exhibit EN-GT-10: Letter to Direct Discharges Permits Section of ANR (12/14/07)
- Exhibit EN-GT-11: Predicting the Downstream dispersion of VY's Thermal Plume (March 2008)
- Exhibit EN-GT-12: Letter to Kenneth Cox of Vermont Fish and Wildlife Department (8/2/10)
- Exhibit EN-GT-13: Letter to U.S. Fish and Wildlife Service from Hydropower Division of FERC (6/16/09)
- Exhibit EN-GT-14: Letter from Kenneth Cox of Vermont Fish and Wildlife Department (6/7/10)
- Exhibit EN-GT-15: Emails from Kenneth Cox (9/9/11) and Draft EAC Recommendations on NPDES Permit
- Exhibit EN-GT-16: Emails among Kenneth Cox and others dated 10/7/11 and 10/25/11
- Exhibit EN-GT-17: Assessment of Thermal Exposure of Emigrating Salmon Smolts to Holyoke Dam (Mar '12)
- Exhibit EN-GT-18: Emails among Elise Zoli, Catherine Gjessing, Gina Atwood and Kathleen Casey (11/28/12)
- Exhibit EN-GT-19: Email from Kenneth Cox to Mattson, Gries, Carpenter and Slater (2/27/08)
- Exhibit EN-GT-20: Letter to FERC from New England Field Office of USFWS (5/13/09)
- Exhibit EN-GT-21: Email re FERC's response to information request from USFWS (6/19/09)
- Exhibit EN-GT-22: Email re Northfield flow data needed for plume study (5/1/09)
- Exhibit EN-GT-23: Investigation into Tritium Contamination at VY Station, Vermont Dept. of Health webpage
- Exhibit EN-GT-24: Tritium Investigation Archive 2011, Vermont Dept. of Health webpage
- Exhibit EN-GT-25: Report on Public Health Monitoring, dated Dec. 2012, prepared by Vermont Dept. of Health
- T. Michael Twomey
Direct Testimony of Entergy first filed on June 29, 2012
- T. Michael Twomey
- Richard K. Lester
- Richard Heaps
-
Jeffrey Trannen
- Exhibit EN-JT-1: Resume of Jeffrey Trannen
- Exhibit EN-JT-2: Resources Relied Upon
- Exhibit EN-JT-3: Comparison of Natural Gas Forecasts to Spot Prices
- Exhibit EN-JT-4: Actual Monthly Spot Henry Hub Prices
- Exhibit EN-JT-5: VY Station Nodal Electricity Prices -- Actual vs. Forecasts
- Exhibit EN-JT-6: Spot Contracts Weighted Average Price of Uranium Purchased by Nuclear Power Plants
- Exhibit EN-JT-7: Estimated Value of Revenue Sharing Agreement based on Long Term Equilibrium Prices
- Exhibit EN-JT-8: Estimated Value of Revenue Sharing Agreement based on Price Shocks
- Exhibit EN-JT-9: Estimated Maximum Potential Market Savings for Vermont
- Supplemental Prefiled Testimony filed on February 14, 2013
- Marc Potkin
-
John Goodell
- Exhibit EN-JG-1: Resume of John Goodell
- Exhibit EN-JG-2: U.S. Geological Survey Map
- Exhibit EN-JG-3: Aerial Photo of Site
- Exhibit EN-JG-4: Site Plan
- Exhibit EN-JG-5: Cross-Section of Site
- Exhibit EN-JG-6: Floodplains Map
- Exhibit EN-JG-7: National Wetlands Inventory Map and ANR Environmental Interest Locator Map
- Exhibit EN-JG-8: Vermont Yankee Wetlands Map
- Exhibit EN-JG-9: Permit # WW-2-1035.3
- Exhibit EN-JG-10: Vernon Police Department Letters
- Exhibit EN-JG-11: Vernon Volunteer Fire Department Letters
- Exhibit EN-JG-12: Vermont Agency of Natural Resources Letter and Update
- Exhibit EN-JG-13: Site Plan with Locations of Observed Species and Natural Communities
-
Henry L. Dodson
- Exhibit EN-HLD-1: Resume of Harry L. Dodson
- Exhibit EN-HLD-2: Aerial Photo depicting locations of Gov. Hunt House and Vernon Grange
- Exhibit EN-HLD-3: Viewshed Maps -- Visual Analysis of VY Reactor Complex, Stack and Plume
- Exhibit EN-HLD-4: Existing Conditions Photographs
- Exhibit EN-HLD-5: VY Cooling Tower -- Visual Analysis
- Exhibit EN-HLD-6: Excerpts from 2009 Vernon Town Plan
- Exhibit EN-HLD-7: Excerpts from Windham Regional Town Plan
- Exhibit EN-HLD-8: Excerpts from Town of Hinsdale Master Plan
- Exhibit EN-HLD-9: Vernon Planning Commission Letter
- Exhibit EN-HLD-10: Vernon Selectboard Letter
- William A. Cloutier, Jr.
Direct Testimony of Department of Public Service first filed on October 22, 2012
-
Asa S. Hopkins
- Exhibit PSD-ASH-1: Vermont Comprehensive Energy Plan
- Exhibit PSD-ASH-2: Excerpts from Intergrated Resource Plans
- Exhibit PSD-ASH-3: VELCO 2012 Long-Range Transmission Plan
- Exhibit PSD-ASH-4: ISO-New England Energy Efficiency Forecast 2015-2021
- Exhibit PSD-ASH-5: Efficiency Vermont 2011 Annual Report
- Exhibit PSD-ASH-6: Efficiency Vermont Quarterly Report for period ended June 30, 2012
- Exhibit PSD-ASH-7: Electric Energy Efficiency Potential for Vermont
- Exhibit PSD-ASH-8: How New England Can Save Energy and Cut Costs with Energy Efficiency
- Exhibit PSD-ASH-9: ISO-New England Strategic Planning Roadmap (March 2012)
- Exhibit PSD-ASH-10: Forecast of Expected Regional Electricity and Capacity Prices
- Warren K. Brewer
-
Daniel Garson
- Exhibit PSD-DG-1: Resume of Daniel Garson
- Exhibit PSD-DG-2: View of typical rural, low density residential clusters in vicinity of VY Station
- Exhibit PSD-DG-3: View of typical working farm and open fields in vicinity of VY Station
- Exhibit PSD-DG-4: View of typical single-family residence in vicinity of VY Station
- Exhibit PSD-DG-5: View of VY Station from recreational trail in Hinsdale, NH
- Exhibit PSD-DG-6: Natural Resources Map of Town of Vernon
- Bruce E. Hinkley
- Gregory A. Maret
-
Seth G. Parker
- Exhibit PSD-SGP-1: Resume of Seth G. Parker
- Exhibit PSD-SGP-2: ISO-NE Letter to Marc Potkin re De-List Bid for VY Station
- Exhibit PSD-SGP-3: ISO-NE FCA #6 Results Filing, FERC Docket No. ER12-1678-000 (4/30/12)
- Exhibit PSD-SGP-4: Transcript of CVPS Earnings Conference Call, May 6, 2011
- Exhibit PSD-SGP-5: GMP FERC Form 3-Q (1st Quarter, 2012)
- Exhibit PSD-SGP-6: ISO-NE filing: Revisions to Attachment K and Market Rule 1
- Exhibit PSD-SGP-7: ISO-NE Whitepaper: Addressing Gas Dependence (7/30/12)
- Exhibit PSD-SGP-8: US-Canada Power System Outage Task Force Final Report, April 2004
- Exhibit PSD-SGP-9: IS)-NE New England Wind Integration Study (12/5/10)
- Exhibit PSD-SGP-10: Discovery response of Mr. Potkin
- Exhibit PSD-SGP-11: Discovery response of Mr. Potkin
- Exhibit PSD-SGP-12: Discovery response of Mr. Tranen
- Exhibit PSD-SGP-13: Discovery response of Dr. Lester
- Exhibit PSD-SGP-14: Discovery response of Mr. Heaps
- Robert Stein
-
Thomas E. Kavet
- Exhibit PSD-TEK-1: Resume of Thomas Kavet
- Exhibit PSD-TEK-2: Consensus, Economic Impact Analyses re VY Station (March 2010)
- Exhibit PSD-TEK-3: Boston Globe Article on Vermont Brand (10/12/03)
- Exhibit PSD-TEK-4: Reestimating the REMI Migration Equation Coefficients
- Exhibit PSD-TEK-5: Final Report and Recommendations of VT Rural Energy Council (Aug. 2007)
- Nicholas O. Rockler
-
Andrea Cohen
- Exhibit PSD-AC-1: Leveraging the Vermont Brand (July 2010)
- Exhibit PSD-AC-2: Vermont Department of Tourism and Marketing Outlook (2010)
- Exhibit PSD-AC-3: A Report ot the General Assembly on the Vermont Brand (Jan. 2006)
- Exhibit PSD-AC-4: Study of the Use of the "Vermont" Name
- Exhibit PSD-AC-5: The Vermont Brand, O'Neal Strategy Group (5/21/03)
- Marcia Greenblatt
-
John Samuelian
- Exhibit PSD-JS-1: Resume of John Samuelian
- Exhibit PSD-JS-2: Letter from U.S. Fish and Wildlife Service to ANR Secretary (3/16/12)
- Exhibit PSD-JS-3: Modeling migratory energetics of Connecticut River American shad
- Exhibit PSD-JS-4: Spawning Dynamics of American shad
- Exhibit PSD-JS-5: Upper Thermal Tolerances for New England Freshwater Fish Species
- Exhibit PSD-JS-6: Metabolic ratess in an anadromous clupeid, the American shad
- Exhibit PSD-JS-7: Migration delays caused by anthropogenic barriers: salmon smolts
- Exhibit PSD-JS-8: Report on the Future Sustainability of Connecticut River Shad
Direct Testimony of Agency of Natural Resources filed on October 22, 2012
Direct Testimony of Conservation Law Foundation filed on October 22, 2012
- Paul Chernick
-
Joyce Cusimano
- Exhibit CLF-JC-1: Excerpt from Transcript of Technical Hearing in Dkt. 7440 -- Thayer (5/20/09)
- Exhibit CLF-JC-2: Excerpt from Transcript of Technical Hearing in Dkt. 7440 -- Colomb (5/26/09)
- Exhibit CLF-JC-3: Corrections to Testimony and Discovery in Dkt. 7440 (9/5/10)
- Exhibit CLF-JC-4: Morgan Lewis Report of Investigation filed in Dkt. 7440 (4/22/10)
- Exhibit CLF-JC-5: Attorney General's Criminal Investigation Report (7/6/11)
- Exhibit CLF-JC-6: VY Update Memo from Curtis Hebert to J. Wayne Leonard (5/6/10)
- Exhibit CLF-JC-7: Complaint for Declaratory and Injunctive Relief, U.S. Dist. Ct. (4/18/11)
- Exhibit CLF-JC-8: Supplemental Report of Public Oversight Panel re VY Station Reliability
- Exhibit CLF-JC-9: Memorandum of Understanding in Dkt. 6545 (3/4/02)
- Exhibit CLF-JC-10: Excerpt from Entergy Brief in Dkt. 7440 (7/17/09)
- Exhibit CLF-JC-11: NYPSC Order re Petition of Entergy Nuclear FitzPatrick (8/19/10)
- Exhibit CLF-JC-12: Parker Prefiled Testimony for DPS in Dkt. 7440 (5/29/08)
- Exhibit CLF-JC-13: Hearing Transcript in Dkt. 7440 (7/30/08)
- Exhibit CLF-JC-14: Transcript of Deposition of Curtis Hebert in US. Dist. Ct. Case (8/30/11)
- Exhibit CLF-JC-15: Transcript of Deposition of Timothy Meehan in US Dist. Ct. Case (8/11/11)
- Exhibit CLF-JC-16: Trial Transcript Excerpt of Jay Thayer testimony in US Dist. Ct. Case (9/13/11)
- Exhibit CLF-JC-17: Transcript of Vermont Legislative hearing (3/18/05) from US Dist. Ct.testimony
- Exhibit CLF-JC-18: Vt. Superior Ct. Complaint by GMP v. Entergy (11/14/11)
- Exhibit CLF-JC-19: Answer to GMP Complaint in US Dist. Ct. (1/18?12)
- Louis Porter
Direct Testimony of Green Mountain Power Corporation filed on October 22, 2012
Direct Testimony of New England Coalition filed on October 22, 2012
Direct Testimony of VNRC and CRWC filed on October 22, 2012
-
David L. Deen
- Exhibit DLD-1: Resume of David L. Deen
- Exhibit DLD-2: Review of VY Station Thermal Discharge Modeling (2/6/12)
- Exhibit DLD-3: Review of VY Thermal Discharge Permit/River Temperature & Flow Analysis (8/17/12)-Part 1
- Exhibit DLD-3: Review of VY Thermal Discharge Permit/River Temperature & Flow Analysis (8/17/12)-Part 2
- Exhibit DLD-4: Selection of Representative Important Species for River in VY Station Vicinity (2/6/12)
- Exhibit DLD-5: Upper Thermal Tolerances for New England freshwater fish species (5/25/12) -- Part 1
- Exhibit DLD-5: Upper Thermal Tolerances for New England freshwater fish species (5/25/12) -- Part 2
- Exhibit DLD-6: US DOI Replies to CRWC Queries re Connecticut River American Shad (7/2/07)
- Exhibit DLD-7: Summary of resumes of of four individuals
-
Kim L. Greenwood
- Exibit KLG-1: Resume of Kim L. Greenwood
- Exibit KLG-2: ANR Growndwater Protection Rule and Strategy (Part 1)
- Exibit KLG-2: ANR Growndwater Protection Rule and Strategy (Part 2)
- Exibit KLG-3: Discovery response and NRC Ground Water Monitoring Inspection Report
- Exibit KLG-4: Discovery response in Dkt. 7600 and excerpts from attachment
Full Schedule for the Proceeding:
- April 16, 2012 --- Entergy filed Amended Petition
- May 2, 2012 --- Prehearing Conference
- June 18, 2012 --- Intervention Deadline
- June 29, 2012 --- Entergy Prefiled Testimony
- July 27, 2012 --- First Round of Discovery on Entergy
- August 17, 2012 -- Entergy Responses to First Round Discovery
- September 19, 2012 - Second Round of Discovery on Entergy
- October 3, 2012 --- Entergy Responses to Second Round of Discovery Due
- October 22, 2012 --- Other Parties' Prefiled Testimony Due
- November 7, 2012 --- Public Hearing in Vernon, Vermont
- November 19, 2012 --- Public Hearing via Vermont Interactive Television
- November 13, 2012 --- First Round of Discovery on Other Parties Due
- December 5, 2012 --- Responses from Other Parties to First Round of Discovery Due
- December 22, 2012 -- Second Round of Discovery on Other Parties Due
- January 11, 2013 ---- Responses from Other Parties to Second Round of Discovery Due
- January 14, 2013 --- Notices of Depositions Due
- Jan. 22-Feb. 3, 2013 -- Depositions (if needed)
- Feb11-15,19-22,25&26 - Technical Hearings on Direct Case
- March 15, 2013 --- Entergy Prefiled Rebuttal Testimony Due
- March 27, 2013 --- Discovery on Entergy's Rebuttal Testimony Due
- April 10, 2013 --- Entergy's Discovery Responses Due
- April 29, 2013 --- Other Parties' Prefiled Surrebuttal Testimony Due
- May 9, 2013 --- Discovery on Other Parties' Surrebuttal Testimony Due
- May 22, 2013 --- Discovery Responses from Other Parties Due
- May 23, 2013 --- Notices of Depositions Due
- May 28-June 6, 2013 -- Depositions (if needed)
- June 17- June 28 --- Technical Hearings (Rebuttal Case)
- August 6, 2013 --- Proposals for Decision and Briefs Due
- August 26, 2013 --- Reply Briefs Due
Parties:
Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc. (collectively, "Entergy")
Vermont Department of Public Service ("Department" or "DPS")
Vermont Agency of Natural Resources ("ANR")
International Brotherhood of Electrical Workers, Local Union 300 ("IBEW")
Green Mountain Power Corporation ("GMP")
Vermont Electric Cooperative, Inc.
Conservation Law Foundation ("CLF")
Vermont Natural Resources Council ("VNRC")
Connecticut River Watershed Council ("CRWC")
TransCanada Hydro Northeast, Inc.
New England Coalition, Inc. ("NEC")
Vermont Public Interest Research Group
Associated Industries of Vermont
Windham Regional Commission ("WRC")
Town of Vernon
Certain Motions and Responses:
- CLF's Objection to Prefiled Rebuttal Testimony and Exhibits, filed on April 1, 2013
- NEC's Motion to Stay, filed on February 1, 2013
- NEC's Motion to Consolidate, filed on February 1, 2013
- Motion to Amend Protective Agreement, filed on January 31, 2013
-
Department's Motion for Official Notice of Certain Prior Testimony, filed on January 30, 2013
-
Responses to Board Order of January 7, 2013
-
Motions filed on November 21, 2012
-
Responses to the Motions filed on November 21, 2012 and Replies
- Department's Response to Entergy's Objection to Admission of Testimony, filed on 12/21/12
- Department's Response to Entergy's Objection to Admission and Motion to Strike, filed on 12/21/12
- Department's Opposition to Entergy's Motion for Partial Summary Judgment, filed on 12/21/12
- ANR's Opposition to Statement of Material Facts in Motion for Partial Summary Judgment, filed on 12/21/12
- CLF's Response to Motions, filed on 12/21/12
- NEC's Oppostion to Motions, filed on 12/21/12
- Response of VNRC and CRWC to Motions, filed on 12/21/12
- Entergy's Reply in Support of Objection to Testimony, filed on 1/4/13
- Entergy's Reply in Support of Objection to Testimony and Motion to Strike, filed on 1/4/13
- Entergy's Reply in Support of Motion for Partial Summary Judgment, filed on 1/4/13
- Entergy's Opposition to Counter Statement of Facts, filed on 1/4/13
-
Motion re Scope of Proceeding
- Entergy's Motion for Declaratory Ruling Prescribing Scope of Proceeding filed on June 22, 2012
- Department's Response to Entergy's Motion filed on July 20, 2012
- WRC's Reply to Entergy's Motion filed on July 16, 2012
- NEC's Opposition to Entergy's Motion filed on July 19,2012
- CLF's Opposition to Entergy's Motion filed on July 20, 2012
- Entergy's Reply Brief in Support of its Motion filed August 6, 2012